7 8 9 10 11 12 13 14Progress photos of demolition at Echo Horizon School. The old playground and asphalt is being removed to prep for the new outdoor space. Looking good.

 

10 600x400 watermark 11 600x400 watermarkHABC continues to make progress at La Reina School, pictured above is some current site work. A large planter, that will provide seating for students and colorful landscaping has been installed. Also concrete flatwork is poured and finished. More progress photos to come.

 

4 resized56 3 Untitled-1HABC has started campus remodeling on Echo Horizon, a private school in Culver City. The school wishes to reinvent the existing classical playground to provide the students with a new upgraded outdoor space. The playground will provide students with much needed shade, non-carcenogentic synthetic turf, premier sporting courts and highly saturated colorful resistance striping. All designed to give the students a safe and delightful experience while attending school.

 

loft 1 groundbreak 600x400

HABC is proud to announce groundbreaking of the Performing Arts Center at La Reina School. The Project includes demolition and renovation of an existing 8,400 sq. ft second floor building. The new Arts Center will include a theater, ballet and dance studio, recording studio, music room, girls and boys bathrooms and dressing rooms. More photos to come on this project!

*Architect • Pica + Sullivan

1 600x400 watermark 2 600x400 watermark 3 600x400 watermark 4 600x400 watermark 5 600x400 watermark 6 600x400 watermark 7 600x400 watermark 8 600x400 watermark

HABC is excited to announce the groundbreaking of the La Reina Middle School project. The project includes site work demolition, grading, site lighting, new flatwork, landscaping, the installation of a Bio-Retention System, a 400 foot sewer run, 6 modular classrooms and one new bathroom building to support the middle school student body.

Louisville High School’s new library is nearing completion. Here are some recent pictures of some features of the project. HABC and the school are very happy with the progress and are excited for students to be able to enjoy this beautiful study space soon. The rich colored bookshelves, large projector screen, bright skylights, and comfortable seating are just a few of our favorite features of this project. More photos to come!

 

Here are some recent snapshots of the LVHS library as HABC finishes lighting and cabinetry installation. The combination of natural light and electric lighting inside the library will make a comfortable atmosphere for students to study in. Exterior patio lighting will provide students with an outdoor study option. More pictures to come.

Here are a couple of snapshots of workers installing Crossville ceramic tile and marble stone steps at the LVHS Library project. The  ceramic tile has a wood grain texture and by looking at it you would swear it was wood finish. Pretty awesome.

Here are some recent progress pictures of the new Library at Louisville High School. Shown above are workers as they install drywall, paint, prepare for granite work and wood ceilings. Many important interior elements will be coming together this week and next, more pictures to come.

HABC finished work at St Anastasia’s and the new campus plaza is complete. The outdoor space includes an eating area, serving counter, shade structure, concrete flat work and brick flooring. We hope the school students enjoy this area for many years to come!