31 21 600x400HABC has started on site preparation for Vista Knoll Specialized Care Center. This Skilled Nursing and Rehabilitation Center requires a new nursing station and upgrades to corridor hallways. All areas that will be remodeled are fully enclosed and vacuum ventilated as to keep the premises safe and clean. Keeping a clean and safe work site is top priority to HABC, and we are excited to begin this project! Pictured above is the walled off “under construction” nurse station.

 

1 600x400 2 600x400 3 600x400 4 600x750 5 600x400 6 600x400

 

HABC is in the finishing stages of Echo Horizon School campus playground. As the final details come together the project is finished just in time for students as they return from Summer break. Our final photos to come!

new post 600x 500

This was an accelerated, fast paced project….. the addition of a complete middle school campus in just 60 days. This project included grading, six new modular classrooms, a modular restroom, extensive flat work, a service road, landscape, and added drainage systems. Installation of a vegetated bio swale system adds more colorful landscape while addressing storm water issues. The new classrooms are fully equipped with fire sprinkler and fire alarm systems. Classrooms line the new outdoor courtyard area which includes landscaping and lighting to illuminate the space during evening events. HABC hopes that returning and new students make many happy memories at their new school campus!

13 600x400watermark 14 600x400 watermark 15 600x400 watermark Here are a few photos of the landscaping and colored concrete work that is in full swing at La Reina School.

 

20

21

22

23

24

25

26

27

Photos of the concrete work at Echo Horizon. Prepped, poured, smoothed and finished…glad to have this work done before the rainstorm that hit Southern California!

 

 

7 8 9 10 11 12 13 14Progress photos of demolition at Echo Horizon School. The old playground and asphalt is being removed to prep for the new outdoor space. Looking good.

 

10 600x400 watermark 11 600x400 watermarkHABC continues to make progress at La Reina School, pictured above is some current site work. A large planter, that will provide seating for students and colorful landscaping has been installed. Also concrete flatwork is poured and finished. More progress photos to come.

 

4 resized56 3 Untitled-1HABC has started campus remodeling on Echo Horizon, a private school in Culver City. The school wishes to reinvent the existing classical playground to provide the students with a new upgraded outdoor space. The playground will provide students with much needed shade, non-carcenogentic synthetic turf, premier sporting courts and highly saturated colorful resistance striping. All designed to give the students a safe and delightful experience while attending school.

 

loft 1 groundbreak 600x400

HABC is proud to announce groundbreaking of the Performing Arts Center at La Reina School. The Project includes demolition and renovation of an existing 8,400 sq. ft second floor building. The new Arts Center will include a theater, ballet and dance studio, recording studio, music room, girls and boys bathrooms and dressing rooms. More photos to come on this project!

*Architect • Pica + Sullivan

1 600x400 watermark 2 600x400 watermark 3 600x400 watermark 4 600x400 watermark 5 600x400 watermark 6 600x400 watermark 7 600x400 watermark 8 600x400 watermark

HABC is excited to announce the groundbreaking of the La Reina Middle School project. The project includes site work demolition, grading, site lighting, new flatwork, landscaping, the installation of a Bio-Retention System, a 400 foot sewer run, 6 modular classrooms and one new bathroom building to support the middle school student body.